Home

Old Bridge Gets a Facelift

1 Comment

This bridge get a workout at least twice a year for the winter solstice and the summer solstice. About every ten years it needs a facelift. Fortunately, it was designed to last and to be repaired.

This bridge was built by Tony and Claudio. Ten years ago it was resurfaced the first time.

One of the posts was replaced as well.

This year, Augostin did the work—a great winter project.


.

All ready for the solstice revelers.

Bridge Damage

Leave a comment

Fedex clipped the bridge and didn’t even stop to tell us about it. They are now officially in trouble.

New bridge at the shed

Leave a comment

CAM00022

Sistered beams are 42 feet long. All timber frame pinned.